Photograph by Norbert Tukaj

News

25/11/2026

Business Stadium Central

Reinterprets the geometries of the neighbourhood's historic civic architecture

The new Business Stadium Central is integrated within the Vilnius City Plan and its adjacent public square.

Incorporating two low-rise towers of eight and nine storeys connected at street level by a courtyard atrium and linked by a skybridge at level five, the design reinterprets the geometries of the neighbourhood’s historic civic architecture.

This 24,000 sq. m mixed-use development includes landscaped terraces, roof gardens and plazas connected to the new public square designed by acclaimed landscape architect Martha Schwartz.

Photograph by Norbert Tukaj

Projects

Vilnius Business Stadium

Incorporating two low-rise towers of eight and nine storeys connected at street level by a courtyard atrium and linked by a skybridge at level five, the design reinterprets the geometries of the neighbourhood’s historic civic architecture.

Designed with maximum adaptability to extend the life-cycle of the development

The terraces and balconies of the centre’s higher floors have been designed by ZHA with subtle curvatures that direct the towers’ composition towards the historic Gediminas Castle Tower in the heart of the city.

Elevators lead directly from the atrium courtyard to the centre’s top floors where public swimming pools, saunas, steam rooms, and sun decks offer panoramic views of Vilnius’ historic Old Town.

Flexible office spaces on central floors are designed with maximum adaptability to extend the life cycle of the development. Differing in layout to suit a variety of companies from new start-ups to established international corporations, workplaces connect with landscaped roof gardens and terraces.

Sustainable building strategies reduce the development’s embodied carbon and energy consumption

Located within Vilnius’ humid continental climate, annual solar analysis has defined the composition of the façade’s external louvres and balconies that have been engineered to reduce direct exposure from the summer sun while optimising solar heat gain in winter.

Natural hybrid ventilation with high-efficiency heat exchange and recovery systems reduce energy consumption, while double-insulated low-E glazing provides excellent levels of natural light throughout all public spaces and workplaces.

Sustainable building strategies also reduced the development’s embodied carbon and energy consumption. Digital optimisation design processes minimised the materials required for the structure while procurement systems integrated with local supply chains increased the project’s recycled content.