
Photograph by Xue Liang 薛亮
Jiangxi River Bridge
News
16/8/2023
ZHA completes Jiangxi River Bridge in Chengdu

Courtesy of Arch-Exist
Jiangxi River Bridge
New 295-metre Chengdu West First Bridge
The first in a series of bridges on Chengdu's West Line Road, the new 295-metre Chengdu West First Bridge crosses the Jiangxi River, a tributary of the Tuojiang River in China’s Sichuan province.
With its 185-metre central span and 55-metre secondary spans reaching to the riverbanks, the Chengdu West First Bridge is a road, cycle and pedestrian bridge over the meandering Jiangxi River; enabling the West Line Road to become the western section of the Airport New Town ring-road and cycle route.
As arches provide the most efficient bridge structure for spans between 120-250 metres, this symmetrical bridge is composed of two primary steel arches that rise from either side of the road deck. As they rise, the arches lean together to touch tangentially at their crown, stabilising the structure from lateral wind forces.
The dynamic curvature of the bridge’s supporting piers and abutments taper into its primary arches and road deck, defining a sculptural landmark within Chengdu’s transport infrastructure.

Courtesy of Arch-Exist
Jiangxi River Bridge
Designed to exceed the standards required for once-in-200-year weather events
Commissioned to build the bridge following the 2019 design competition, ZHA used structural analysis software on the design’s digital model. Examining all material self-weight, superimposed dead load and traffic live loading, as well as environmental considerations of wind and temperature, this analysis ensured the structure and foundations have been designed to exceed the standards required for once-in-200-year weather events.
With a height to span ratio of approximately 1:6, the bridge’s arches rise to 30 metres and are tied together at their base by longitudinal box girders that run along the edge of the road deck. These ties resist the outward horizontal thrust of each arch and significantly reduce the horizontal loads on the bridge’s foundations.
Concrete abutments at either end of the bridge incorporate connectors linking the road deck to the West Line Road’s surface. With no foundations positioned in the Jiangxi River, intermediate piers are located beneath the springing points of the arches on each riverbank.


Photograph by Xue Liang 薛亮
Jiangxi River Bridge
Project
Jiangxi River Bridge
The dynamic curvature of the bridge’s supporting piers and abutments taper into its primary arches and road deck, defining a sculptural landmark within Chengdu’s transport infrastructure.

Courtesy of Arch-Exist
Jiangxi River Bridge
Optimal dimensions for transportation and assembly on site
The bridge’s bored piles and abutments were constructed using conventional in-situ reinforced concrete techniques. The steel box sections of each arch were prefabricated in optimal dimensions for transportation and assembly on site. The edge box girder sections within the road deck include the cable anchorages. These sections were also prefabricated and delivered in sections to be spliced together with on-site welding.
The bridge’s prefabricated plate cross girders were delivered to the site and connected to the edge girders by a bolted cover plate splice connection. The concrete road deck has been constructed from precast panels fixed to the cross girders by in-situ concrete stich pours.
Mobile cranes lifted all prefabricated steelwork and precast concrete elements within the bridge’s short assembly schedule. The Chengdu West First Bridge crossing the Jiangxi River will open to the public on completion of the West Line Road.
News
Discover more news from ZHA
From project announcements and site reports to emergent research, explore the latest news from ZHA

News
Benghazi 2050: Vision and Digital Planning Hub

News
ZHA announces Baku Expo City masterplan

Render by Devisual
News
Z8 Tower construction to begin

Courtesy of Maria Docam Studio
News
New ECHO Chair collection by ZHA for Nagami

Photograph by Hufton + Crow
News
The new National Bank of the Republic of Kazakhstan headquarters now fully operational

Photograph by Hufton + Crow
News
New Terminal 3B (T3B) at Chongqing Jiangbei International Airport photography by Hufton+Crow

Photograph by Virgile Simon Bertrand
News
Songshan Lake Exhibition and Performance Centre hosts inaugural programme of events

News
ZHA announces the Nest and Cascades

News
Events & Exhibitions
Aeris Collection by ZHA for Citco

Photograph by Jacopo Spilimbergo
News
Origin ZHA x Audi

Photograph by Hufton + Crow
News
Awards
Two new stadiums by ZHA nominated for Stadium of the Year 2026

News
ZHA & CY Lee to design NICFC in Taipei

News
ZHA to design Qiantang Bay Cultural District

Render by X-Universe
News
Bishoftu International Airport construction begins

Render by Negativ
News
ZHA to design the first vertex hotel

Render by X Universe
News
ZHA and partners to design Malpensa Hospital

Photograph by SeilaoJiong 张灏
Sports Centre
News
Greater Bay Area Sports Centre to host inaugural events

Render by Bloomimages
News
Imtiaz Developments announce The Symphony Tower

News
ZHA signs contract with Lithuanian Airports

News
Yidan Center reaches full height
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20